HTK Confidence Ship (GIC Construction Cleaning and Painting)
DIMENSIONS LOA 169.26 m LBP 161.210 m Breadth moulded 27.2 m Draught (summer) 9.779 m [...]
09
July
July
2x1200CV tugboat (GIC Construction cleaning and painting)
Overall length, max 30.96 m Beam at design 10.15 m Height at design [...]
08
July
July
18,000 DWT barge (Southwest construction anti-corrosion)
Overall length, max 122.40 m Beam at design 44.00 m Height at design [...]
12
Nov
Nov
Dai Hung 01 Drilling Rig (GIC Construction cleaning, painting, and scaffolding installation BS1139)
Overall length, max 108.2 m Breadth at design mound 67.36 m Main deck length [...]
12
Nov
Nov
VSP Tam Dao Scaffolding 01 (GIC Construction, installation of BS1139 scaffolding)
INVESTOR: Dung Quat Shipbuilding Industry Company (DQS) Scope of work: [...]
21
August
August



